FSAALT (Executed)

House on the Cliff en Calpe

Fran Silvestre Arquitectos

2005 - 2012

Awards

Red Dot Design Award 2013

Photography

Gemma Aparicio

Due to the fact of having a triangular plot and on an extreme slope, magnificent views invite you to look towards the horizon, floating between the sea and the sky. Far from settling on the rocky terrain of the complex plot, the house is completely cantilevered. The davit at one end, and a wall only crossed by the access to the atrium of the pool, at the other end, serve as support for the main body of the house, which, without lower supports, floats thanks to the joint collaboration of the slabs and walls. It materializes a rigid piece, where floor, ceiling and walls participate of the resistance against the flexion caused by 18m of width between two structural supports and 8m of cantilever. Structure and architecture are merged into a single built object, where the coordination of the project teams is fundamental for a unit quality result.

The foundation in the rocky ground allowed the house to appear to emerge from the mountain, thanks to the high bearing capacity of the terrain, together with the execution of 4 foundation piles anchored in depth to mobilize tractions in the rear area of the main footing of the pile caps.

In addition to the adequate structural performance of the building, this project required the design, calculation and execution of the temporary system of formwork for the flown body, managing to solve the construction at a fraction of the cost budgeted initially. The carrying capacity of the walls buried in the rock was ingeniously used to fly a temporary metal grating, which, together with the correct temporal planning of the concreting process, led to a unique, safe and economic execution system.

FSAALT_F15
FSAALT_F34
FSAALT_F33
FSAALT_F32
FSAALT_F31
FSAALT_F29
FSAALT_F12
FSAALT_F11
FSAALT_F09
FSAALT_F07
FSAALT_F06
FSAALT_F05
FSAALT_F04
FSAALT_F02
FSAALT_F13
FSAALT_F10
FSAALT_F17
FSAALT_F01
FSAALT_C02
FSAALT_C09
FSAALT_C05
FSAALT_C03
FSAALT_C16
FSAALT_C15
FSAALT_C14
FSAALT_C13